Elliot Bridge Construction

Project Overview The Elliot Bridge Construction project involved building a new bridge structure designed to meet Hamilton County’s requirements for long-term durability. The county specifies that new bridge construction must achieve a 100-year service life, making corrosion protection a critical component of the design process. Problem The customer required a new construction solution that would […]

Punaluu Stream Bridge

Project Overview The Punaluu Stream Bridge is situated only steps away from the Pacific Ocean, exposing it to harsh marine conditions. Strong trade winds, chloride-laden rainfall, and volcanic emissions combine to create a highly corrosive environment that threatens the durability of the structure. A corrosion protection solution was required to ensure long-term performance of the […]

Restoration of Bullet Train Structures

Project Overview The restoration project focused on concrete structures supporting the Sanyo Shinkansen Bullet Train system. Severe quality control concerns emerged due to chloride-contaminated concrete, resulting in widespread spalling and corrosion. The affected areas required repair and long-term protection to prevent further deterioration. Problem Concrete used in the construction of bullet train bridges contained seashore […]

Sharjah Waste-to-Energy Plant

Project Overview The Sharjah Waste-to-Energy Plant required a durable piling system capable of withstanding long-term structural and environmental demands. Concerns arose regarding insufficient concrete cover for the piles, prompting the project team to seek additional protection methods to reduce the risk of corrosion. Problem During planning and construction of the waste-to-energy plant, it was determined […]

Hakalau Seismic Retrofit

Project Overview The Hakalau Bridge in Hawaii was experiencing significant deterioration due to steel girder corrosion caused by volcanic sulfuric dioxide and chloride-rich moisture from the Pacific Ocean. Many areas of the bridge exhibited severe rusting, particularly locations where surface preparation was difficult to perform effectively. This corrosion threatened the durability and structural safety of […]

Doha Development Preservation

Project Overview The Doha Development Preservation project centers on Barwa Commercial Avenue, an 8 km commercial and residential development featuring modern homes, offices, restaurants, showrooms, and retail facilities. The development covers an area of 894,000 m² (1,066,900 yd²) with a built-up area of 462,000 m² (552,550 yd²).A key objective was to ensure long-term durability and […]

Burj Khalifa Tower (Burj Dubai)

Project Overview The Burj Khalifa stands as the world’s tallest building and required a highly durable structural design capable of meeting demanding long-term performance expectations. The project incorporated advanced concrete corrosion protection measures to ensure structural reliability throughout its 100-year design life. Application MCI® 2005 was incorporated into the concrete mix design for the podium […]